Variable cost
A variable cost is an expense that rises and falls with output or sales volume, such as raw material, packing, piece-rate wages and freight per unit.
What it means
Make more units and variable costs go up; make none and they fall to nothing. This is unlike rent or a manager's salary, which stay the same in the short run. Knowing the variable cost per unit tells you the least you can charge on an extra order without losing money on it. The gap between price and variable cost, called contribution, is what pays for the fixed costs and then profit.
Example
A plastic moulder makes buckets with ₹38 of resin, ₹3 of packing and ₹4 of power per piece, a variable cost of ₹45. A bulk buyer offers ₹52 for 5,000 pieces. Each bucket contributes ₹7, adding ₹35,000 towards rent and salaries that would be paid anyway.
Records and checks
- Record material, packing, direct labour and freight per unit for each product.
- Verify the figures against recent purchase invoices and actual consumption, not old estimates.
- Accounts updates them monthly; the production head confirms usage and wastage.
Common mistakes
- Treating all wages as fixed when part of them follows output, which understates variable cost.
- Pricing extra orders below variable cost, which creates a loss on every unit shipped.