Variance
Variance is the difference between an actual figure and the planned, budgeted or standard figure it is compared with, shown as a number and as favourable or adverse.
What it means
In costing, a material variance compares the actual material used with the standard allowed. A favourable variance helps profit, and an adverse one hurts it. Variance is a flag, not a verdict: it tells you where to look and the reason must still be found. In statistics, the word has a different technical meaning, but in business reports it normally means this gap.
Example
The standard cost of material for a job is ₹50,000. The actual spend is ₹56,500, an adverse variance of ₹6,500 or 13 percent. Investigation shows that 80 kg of steel was lost to a wrong cutting list.
Records and checks
- Record the standard or plan figure, the actual figure, the difference and the reason for it.
- Verify the standard was current and that the actual includes all costs for the period.
- The cost accountant reports it, and the department head explains each large variance.
Common mistakes
- Reporting the variance without finding its cause, so it repeats.
- Using an outdated standard, so every variance looks like a problem or a gain.