Weld inspection

Weld inspection is the examination of welded joints, by eye, gauges or testing methods, to confirm they are the right size, free from unacceptable defects and meet the specification.

What it means

Most checks start with visual inspection for cracks, undercut, porosity, spatter and weld size. Critical joints may also get dye penetrant, magnetic particle, ultrasonic or radiographic testing, as the customer or code requires. Inspection happens before, during and after welding, because fit-up and cleanliness problems are cheaper to fix early.

Example

A fabricator builds 12 pressure skids. The inspector checks every fillet weld with a gauge and does dye penetrant on the nozzle welds. One crack is found and ground out and rewelded, and the test is repeated before the skid is painted.

Records and checks

  • Record the joint number, welder identity, inspection method, result and any repair done.
  • Verify that inspection covers the joints the drawing or customer specification calls for.
  • A qualified inspector signs, and the quality head keeps the file for customer review.

Common mistakes

  • Inspecting only after painting, when defects are hidden and costly to reach.
  • Passing a repaired weld without repeating the original test.