Work breakdown structure
A work breakdown structure is a tiered outline that splits a whole project into deliverables and then into tasks small enough to cost, schedule and give to one person.
What it means
It answers one question: what exactly is the job made of? Each parent item is the sum of its children. Planners use it before quoting, to make sure nothing is forgotten, and during delivery, to compare planned against actual cost for each part.
Example
A small factory builds a conveyor line for a client. Top level splits into frame fabrication, drive and motor assembly, electrical panel, installation and commissioning. Panel work is further split into wiring, programming and testing, each with a ₹ budget and a named technician.
Records and checks
- Record numbered elements with owner, scope note, budget and planned dates, and keep a version history of changes.
- Verify that child items fully cover each parent item and that budgets add up to the contract price.
- The project manager issues it and the team leads sign off their branches.
Common mistakes
- Mixing deliverables with activities, so a line like "meeting" sits beside "panel assembly".
- Never revising it after a scope change, leaving the structure out of step with real work.