Work at height

Work at height is any task carried out where a person could fall from one level to a lower one and be injured, including roofs, ladders, scaffolds and open edges.

What it means

Falls are a leading cause of serious injury in factories and construction. The usual order of control is to avoid the work, then use a safe platform with guardrails, then use fall arrest such as harnesses, and last use ladders for short light tasks.

Example

A warehouse in Bhiwandi needs a roof sheet replaced at 9 metres. The owner hires a crew with a scissor lift at ₹7,000 per day and a permit rather than letting staff climb a ladder, and a spotter is posted below.

Records and checks

  • Record a work permit with location, height, equipment, crew names and permit time.
  • Verify scaffolds, harnesses and anchor points are inspected and tagged before use.
  • The safety officer issues the permit and checks the setup before the crew goes up.

Common mistakes

  • Using a harness without a secure anchor point, so it gives no protection.
  • Treating a quick job on a ladder as too small to need a permit or inspection.

Check the current rule on the official portal or with your CA before acting.