Shift coverage becomes a crisis when someone is absent
Know who can cover which responsibility.
01 · What is usually happening?
Someone calls in sick at six in the morning and a machine has no operator. The supervisor rearranges people, a skilled job goes to someone who has not done it, and the quality or the output suffers.
It happens often enough that everyone has a story, and rarely enough that nobody fixes it.
The question people usually ask“Who covers when someone is absent?”
The more useful question“Which jobs can only one person do, and who is the second?”
02 · Common causes
- 01Skills sit with one person per machine or task
- 02No record of who can do what
- 03Absence is learned at the last minute
- 04No habit of cross-training
- 05Leave is not planned against the work
- 06Contract labour is hard to arrange at short notice
03 · What to check now0 of 6 checked
04 · What good looks like
- 01A skills list shows who can run what.
- 02Every critical task has two people.
- 03Leave is planned against the work.
- 04A short list of dependable contract help is kept.
- 05Cross-training is a regular, small habit.
05 · Where this connects
This rarely stays in one department
What it can lead to: One absence stops a machine and a morning is lost to rearranging.
Start from a problem
Work flows left to right, top to bottomKEYMost important for manufacturing
These support every part of the business
Problem
Shift coverage becomes a crisis when someone is absent
Usually connected to
How it spreads
- People
What it can lead to: One absence stops a machine and a morning is lost to rearranging.
lamplamp could keep a list of who can run which machine.
08 · lamp
lamp could keep this moving
lamp is not available yet. These are things it is being built to do.
- lamp could keep a list of who can run which machine.
- lamp could suggest a cover when someone reports an absence.
- lamp could show tasks that only one person can do.
- lamp could remind you to cross-train before a planned leave.
Does your business handle this differently?Tell us what we have missed: a cause, a check, or a better way of handling it.
Suggest an addition